Como FC New Stadium Capacity: What’s Happening with Stadio Giuseppe Sinigaglia
Como 1907’s rise back to Serie A has fans buzzing, but the historic Stadio Giuseppe Sinigaglia has been a bottleneck. The club wants a bigger, modern home to match their ambitions. So what’s the latest on Como FC new stadium capacity? Plans are moving forward for a major redevelopment—not a brand-new build, but a full upgrade of the existing lakeside ground.
As of early 2026, the project is in approval stages, with construction eyed for 2027–2028. The goal is to boost capacity significantly while keeping the unique Lake Como vibe. Here’s the breakdown.
Current Stadium – Stadio Giuseppe Sinigaglia Basics
Como’s home is Stadio Giuseppe Sinigaglia, opened in 1927 on the shores of Lake Como.
- Current capacity: Around 10,500–12,000 seats (reports vary slightly; recent upgrades took it from ~7,500 to 10,584+ after promotion). Some sources list up to 13,602 total, but usable/Serie A-compliant is lower.
- Built: 1927, designed by Giovanni Greppi under Mussolini’s orders.
- Owner: Municipality of Como.
- Surface: Natural grass.
- Why it’s famous: Stunning location right by the lake—one of the most picturesque stadiums in Europe.
It’s charming but outdated for top-flight demands: limited seats, old facilities, accessibility issues. After Como’s promotion, quick fixes added seats, but a proper overhaul is needed.
Como FC New Stadium Capacity Plans
The redevelopment targets a modernized Sinigaglia, not a relocation.
- Planned capacity: 15,000–20,000 seats (most reports settle around 15,000–17,000 for the final version; some concepts hit 16,000+ to meet UEFA/Serie A standards).
- Increase: Roughly +4,000–7,000 from current levels.
- Design: By Populous (big firm behind many major stadiums). Four new stands, better hospitality, lake-facing premium areas, removed old floodlight masts for cleaner skyline.
- Key features: Rectangular football layout, preserved modernist facade, improved away section (bigger for European games), better lighting/roof, community space around the stadium.
- Cost: Around €70 million (club + municipality funding).
This keeps the historic feel while making it Serie A-ready and fan-friendly.
Location and Why It’s Special
Stadio Giuseppe Sinigaglia sits in Como, Italy, directly on Lake Como’s edge.
- Address: Via Carloni, Como, Lombardy.
- Vibe: Water views from stands, mountains backdrop—one of Serie A’s most scenic spots.
- Access: Easy for locals; train from Milan (~45 min), parking limited on matchdays.
- Surroundings: Redevelopment includes lakeside regeneration—better paths, public areas.
Fans love the location, but it limits massive expansion. The plans respect that, avoiding a full tear-down.
Timeline for Redevelopment
Progress is step-by-step.
- 2025–2026: Design/feasibility approvals (DOCFAP submitted; green light for next stages as of Jan 2026).
- May 2026: Expected end of approval process.
- Oct 2027: Construction Phase I starts.
- Aug 2028: Phase II complete; ready for 2028/29 season.
- Interim: Minor expansions (e.g., +1,200 seats in 2025/26) keep capacity growing short-term.
Delays possible (permits, heritage rules), but club/municipality push hard.
What Fans Can Expect from the Upgrade
- Better experience: More seats, improved views, modern amenities (hospitality, food, accessibility).
- Serie A fit: Meets league/UEFA needs for bigger crowds, especially if Como push Europe.
- Fan impact: Higher demand for tickets; away fans get more space.
- Challenges: Construction phases may mean temporary tweaks or matches elsewhere (unlikely but possible).
It’s exciting for a club that’s gone from lower leagues to Serie A stars.
FAQ
What’s the current capacity of Stadio Giuseppe Sinigaglia?
Around 10,500–12,000 usable seats after recent upgrades (exact figures vary by source; ~10,584 post-promotion fixes).
What will Como FC new stadium capacity be?
Plans target 15,000–17,000 (up to 20,000 in some concepts), with most settling around 16,000 for the finished project.
Is Como building a completely new stadium?
No—it’s a major redevelopment of the existing Stadio Giuseppe Sinigaglia, keeping the lakeside spot.
Where is Como FC stadium located?
Right on Lake Como in Como, Italy—super scenic, about 45 minutes from Milan by train.
When will the new Como stadium be ready?
Approvals wrap by mid-2026; construction 2027–2028; full use likely 2028/29 season.
Why does Como need a bigger stadium?
Serie A rules, growing fanbase after promotion, European potential, and outdated facilities.
Wrap-Up
Como FC new stadium capacity looks set to hit 15,000–17,000 after the Sinigaglia redevelopment finishes around 2028. It’s not just more seats—it’s a modern upgrade that keeps the iconic lake views. Fans get a better matchday, and the club gets a proper home for their Serie A push.
Want the latest on Como matches, predictions, or stadium updates? Sign up for our free newsletter below—straight tips, no spam.